6" Ball Point Bodkin Tubing Elastic Tool by Dritz D783

$3.69

Turn bias tubing, insert elastic into casings, weave ribbon. 6" Length.


~ Instructions ~

BIAS TUBING -
1.Insert ball point of bodkin in closed end of tubing.

2.Push bodkin through center of tubing, gradually turning tubing to inside.

3.Remove bodkin after tube is completely turned.


ELASTIC -
1.Insert elastic into eye of bodkin.

2.Slide bodkin (ball point end first) through casing, stitch ends of elastic to secure.


RIBBON WEAVING - Insert ribbon into eye of bodkin.
Use ball point to weave ribbon through trim or eyelets.


TIP - Pin loose end of elastic to avoid pulling through casing.